Notice of Public Information Centre: Glendon Drive Roundabout and Coldstream Road Realignment

Posted Date
April 29, 2022
notice post

Middlesex County, in partnership with the Municipality of Middlesex Centre have retained Stantec Consulting Ltd. (Stantec) to undertake the Detailed Design for the construction of a roundabout at the intersection of Glendon Drive, Vanneck Road, Coldstream Road and Jeffries Road and the realignment of Coldstream Road (see map).

A key component of the Detailed Design is consultation with interested stakeholders through a Public Information Centre (PIC). The PIC for this study will be held on:

Date: Tuesday, May 10, 2022
Time: Drop-in between 5:30 – 7:30 p.m.
Location: Komoka Health and Wellness Centre
                1 Tunks Lane, Komoka ON

The purpose of the PIC is to present the road improvement design details, construction timing and impacts, staging and detours, along with environmental considerations. Public input will be obtained on the plan and anyone with an interest in the study is invited to attend and participate.
If you are unable to attend the PIC and would like to provide comments, please forward them by Thursday, June 2, 2022 to either of the following Project Team members:

Chris Traini, P.Eng.
Project Engineer
County of Middlesex
@email
519-434-7321 ext. 2347

Isaac Bartlett, P.Eng.
Project Manager
Stantec Consulting Ltd.
@email
519-675-6643

Additional information on the project is available at https://www.middlesex.ca/, including the Environmental Study Report summarizing the Municipal Class Environmental Assessment process completed in 2018.

Personal information collected on this subject is collected under the authority of the Environmental Assessment Act and the Municipal Freedom of Information and Protection of Privacy Act for transparency and consultation purposes. With the exception of personal information, comments and information received will be maintained on file for use during the study and may be included in project documentation.