Environmental Assessments

Blacks Bridge

The Environmental Study Report (ESR) for Blacks Bridge is being made available for public review for a period of 30 calendar days in accordance with the requirements of the Municipal Class Environmental Assessment (2000, as amended). The ESR documents the environmental assessment process completed, including the evaluation of alternatives, anticipated environmental impacts, mitigation measures, consultation completed throughout the study, and commitments for future work.

Glendon Drive

Please see the Glendon Drive Roundabout and Coldstream Road Realignment detailed design along with the Environmental Study Report

Pike Road Bridge

Middlesex County has retained Entuitive and BT Engineering Inc. to complete a Schedule A+ Environmental Assessment for the replacement of Pike Road bridge in Adelaide Metcalfe Township. The study will evaluate all reasonable alternatives to improve the operation, safety and capacity of the existing bridge.

Thorndale Bridge

Middlesex County retained Stantec Consulting Ltd. (Stantec) to identify required improvements to the Thorndale Bridge, on County Road 28 (Thorndale Road). The County of Middlesex identified the Thorndale Bridge, built in 1953, for replacement within the next 10 years. In accordance with the Municipal Class Environmental Assessment (MCEA) (Municipal Engineers Association, 2000, as amended in 2007, 2011, and 2015), this study is being planned as a Schedule C undertaking, which includes the completion of Phases 1 through 4 of the MCEA study process.

Waubuno Creek Bridge Replacement

The County of Middlesex is planning to replace the Waubuno Creek Bridge located on County Road 27 (Nissouri Road) north of County Road 2 (Dundas Street) in the Municipality of Thames Centre. Recent engineering inspections of the structure have identified extensive deterioration of some structural components for the crossing that make rehabilitation of the bridge unfeasible. Replacement of the crossing has been tentatively scheduled for 2024.